Contour Airlines Reddit Guide: DOT Public Charter Rules, Refunds, Baggage, and Part 135 Pilot Minimums

Short answer: Contour Airlines flights operate as DOT public charters on 30-seat regional jets run by Corporate Flight Management across 36 scheduled routes, where non-refundable fares are forfeited if you do not cancel at least 1 hour before departure (contourairlines.com). Rather than hitting login walls on Contour Airlines Reddit threads, travelers and pilots can check carrier rules and federal crew minimums directly. Contour ranks among the 10 largest U.S. Part 135 operators and lists 2026 ERJ and CRJ First Officer minimums of 500 total hours and 25 multiengine hours (Contour Careers) under commercial and instrument rules in 14 CFR 135.245.

Why Contour Operates Differently: 30-Seat Public Charters and Schedule Frequency

Most frustration in online traveler discussions starts with expecting Contour Airlines to run like a high-frequency mainline carrier. Every scheduled Contour Airlines ticket is sold and operated by Corporate Flight Management as a direct air carrier under Department of Transportation (DOT) Public Charter Regulations. The carrier flies 30-seat regional jets across 36 scheduled passenger routes linking smaller regional airports to hub cities.

Because a 30-seat regional operation serves smaller communities with one or a few flights per week rather than hourly bank departures, a single unscheduled maintenance write-up, crew duty limit, or weather hold can push travel back by a day or more. According to Contour's airport directory, several stations operate ticket counters only three or four days per week. Taos opens Mondays, Thursdays, and Sundays, St. Maarten opens Tuesdays, Fridays, and Sundays, St. Thomas opens Mondays, Wednesdays, and Saturdays, and San Juan opens Tuesdays, Thursdays, Fridays, and Sundays. Understanding that sparse schedule structure before you book is the single best defense against getting stranded.

Cancellations, the 1-Hour Forfeiture Rule, and Refund Timelines

Refund disputes happen most often when passengers miss Contour's fare-class restrictions or its strict pre-departure cancellation cutoff. All Contour tickets are non-refundable to your original payment method except Flexible fares canceled prior to scheduled departure, plus Standard and Flexible tickets canceled within 24 hours of booking when booked at least 7 days before the first flight in your itinerary.

Super Saver fares allow zero changes and cannot be canceled for a travel voucher. Standard fares have zero change fees, yet outside the 24-hour booking window they convert only into a courtesy flight credit or Future Travel Voucher valid for 365 days from the original booking date, with no cash value and any fare difference due on rebooking.

Watch the clock if your plans change or you decide to drive instead of waiting out a disruption. You must cancel or change a Standard or Flexible ticket at least 1 hour prior to scheduled departure. Passengers who do not notify Contour at least 1 hour before departure forfeit the entire fare. For eligible U.S. credit card purchases, Contour processes refunds within 10 business days after receiving required refund information, while bookings made outside the U.S., involving another airline, or issued through online travel agencies take up to 45 days.

  • Book directly rather than through third-party online travel agencies whenever possible so eligible U.S. credit card refunds fall under the 10-business-day processing window instead of the 45-day special-handling window.
  • Cancel at least 1 hour before scheduled departure if you choose not to travel on a Standard or Flexible ticket, preserving either your Flexible cash refund or your 365-day Standard travel credit.
  • Call Customer Experience at 1-888-332-6686 if you need immediate itinerary help or ask to speak with a Complaint Resolution Official (CRO) for disability or service compliance issues before, during, or after your flight.
  • Keep boarding passes, booking confirmations, and time-stamped screenshots of flight-status notifications if you submit a written refund claim under DOT Public Charter Regulations.

Baggage Fees, Check-In Cutoffs, Delayed Bags, and Interline Rules

Each passenger may bring 1 carry-on bag measuring at most 22 x 14 x 9 inches (56 x 36 x 23 centimeters) and 1 personal item at no extra charge, plus a fully collapsible stroller under 20 pounds if it fits in an overhead bin. Because 30-seat regional jet bins are compact, carry-on bags that do not fit overhead or under the seat are collected prior to boarding and returned planeside upon arrival. Remove keys, medication, medical devices, laptops, electronic cigarettes, and spare lithium batteries before handing over any planeside or checked bag. Keep checkpoint liquids in containers of 3.4 ounces (100 ml) or less inside one quart-sized bag.

Checked baggage must not exceed 90 linear inches (length plus width plus height), and bags weighing more than 100 pounds are not accepted. Ticket counters at domestic stations open 2 hours prior to departure. Counters open 3 hours prior at San Juan, St. Maarten, St. Thomas, Dominica, and Port of Spain. For Port of Spain flights, the electronic travel portal opens 72 hours before travel, and the St. Thomas counter does not accept cash. Baggage check-in closes strictly 30 minutes before departure at smaller regional airports, 45 minutes before departure at major hubs such as Charlotte, Chicago O'Hare, Dallas Fort Worth, Denver, Fort Lauderdale, Las Vegas, Nashville, Phoenix, and Washington Dulles, and 60 minutes before departure at Los Angeles and Caribbean stations.

If a checked bag is delayed on a domestic U.S. flight, Contour states a goal of returning it within 24 hours, noting that limited flight frequency to regional destinations, weather, or missing local contact details can extend delivery times. Contour maintains interline agreements with four major carriers: Alaska Airlines, American Airlines, JetBlue, and United Airlines. Checked bags transfer automatically only when both carriers are booked together on a single ticket. If you buy separate tickets or connect to a non-partner airline, you must exit to baggage claim, re-check bags at the next carrier's counter, and clear TSA security again. Contour assumes no responsibility for missed onward connections booked on separate tickets.

Baggage, pet, and passenger service fees each way from contourairlines.com, as of November 2026

Fee Category Super Saver and Standard Flexible Fare Published Size, Weight, and Effective Rules
Carry-on and personal item No extra charge No extra charge 1 carry-on up to 22 x 14 x 9 inches (56 x 36 x 23 centimeters) and 1 personal item
1st checked bag $45 $0 Effective May 1, 2026, max 90 linear inches
2nd checked bag $55 $55 Effective May 1, 2026, max 90 linear inches
3rd or additional bag $200 each $200 each Effective May 1, 2026, max 90 linear inches
Overweight bag 51 to 70 lbs $100 $100 Effective May 1, 2026, overweight fee
Overweight bag 71 to 99 lbs $200 $200 Effective May 1, 2026, bags more than 100 lbs not accepted
Sports equipment 63 to 80 in $200 $200 Effective May 1, 2026, 63 to 80 linear inches
Cabin pet $150 $150 Effective July 1, 2026, max 3 per cabin, carrier up to 24 x 16 x 10 inches
Unaccompanied minor $150 $150 Effective July 1, 2026, must meet carriage requirements

Passenger Checklist for Booking Low-Frequency Regional Flights

Travelers who have smooth trips on small regional carriers plan around thin schedules and tight station cutoffs before heading to the airport. Use this checklist created by our team to protect your trip.

  • Build an extra buffer before major events: Fly in early for cruises, weddings, medical appointments, or international long-haul flights rather than relying on a same-day regional leg.
  • Buy interline connections on one ticket: Book Alaska, American, JetBlue, or United connections on a single itinerary so bags transfer automatically and your onward carrier sees your connecting status.
  • Map backup ground transport in advance: Small regional terminals often have only one or two rental car counters, so check local rental hours and highway drive times to the nearest major hub before travel day.
  • Submit special-assistance or pet requests 48 hours early: Notify Customer Experience at least 48 hours before departure for powered wheelchairs, special seating, or DOT Service Animal forms, and call in advance to reserve one of the 3 cabin pet slots allowed per flight.

Pilot Careers: ERJ, CRJ, and Corporate Jet Minimums, Bases, and CASS

In pilot forums, aviators weigh Contour primarily as a Part 135 pathway into multi-crew turbine flying prior to meeting the 1,500-hour threshold required at Part 121 airlines. According to Contour Careers, the company operates scheduled and charter flights with ERJ crew bases in Charlotte, NC and Phoenix, AZ, plus CRJ crew bases in Chicago, IL, Fort Lauderdale, FL, and White Plains, NY. Pilots are enrolled in Known Crew Member (KCM) and the Cockpit Access Security System (CASS) with reciprocal jumpseat agreements, alongside space-available employee travel on Contour and MyIDTravel partners. Contour also offers a 401(k) retirement plan with an immediate 6% match starting on day one.

Published 2026 flight-time qualifications on Contour Careers vary sharply between the scheduled regional jets and the corporate charter fleet, as well as between First Officer and Captain seats. Note that individual fleet listings open and close based on staffing demand, and base assignments are confirmed during the hiring process.

If your goal is rapid upgrade rather than logging Second in Command turbine hours and moving on, watch the Pilot in Command math closely. By our calculation from the 2026 Contour Careers First Officer and Captain minimums, an ERJ or CRJ First Officer hired at the 500-hour total-time and 25-hour multiengine floor needs 1,000 additional total hours and 475 additional multiengine hours to reach the 1,500-hour total and 500-hour multiengine Captain minimums, and still must bring or separately log 500 Pilot in Command hours because right-seat Second in Command flying does not add PIC time.

Published 2026 pilot flight-hour minimums by fleet from Contour Careers, as of November 2026

Fleet and Crew Seat Total Time Seat-Specific Flight Hours Additional Published Qualifications
CRJ First Officer 500 minimum 25 multiengine minimum Commercial multiengine and instrument per 14 CFR 135.245
ERJ First Officer 500 minimum 25 multiengine minimum Commercial multiengine and instrument per 14 CFR 135.245
Embraer Legacy 600 First Officer 1,000 minimum 500 PIC, 25 multiengine minimum 75 instrument hours
Cessna Citation XLS First Officer 1,200 minimum 250 PIC, 25 multiengine minimum 75 instrument, Commercial ME, SIC type rating, First-Class Medical recommended
ERJ Captain 1,500 min / 2,500 rec 500 min / 1,000 rec PIC and multiengine Type rating and currency recommended
Embraer Legacy 600 Captain 3,000 1,500 PIC, 250 PIC in type Must be current and proficient in type
Cessna Citation XLS Captain 3,500 2,000 PIC, 2,000 turbine 250 PIC in type

FAA Part 135 Rules Behind 500-Hour Jet Jobs and Simulator Training

Non-pilots and low-time instructors often ask how a carrier can place a 500-hour pilot in the right seat of a 30-seat regional jet. Under FAA pilot certification rules, civil pilot licenses progress from student pilot up to airline transport pilot (ATP). While Part 121 scheduled airlines require an ATP or Restricted ATP for both seats, Part 135 splits crew qualification standards between the Captain and First Officer under Title 14 CFR Part 135 Subpart E.

Under 14 CFR 135.245, a Part 135 Second in Command must hold at least a commercial pilot certificate with appropriate category and class ratings and an instrument rating. To fly under Instrument Flight Rules (IFR), 14 CFR 135.245 requires the Second in Command to log at least six instrument approaches, holding procedures, and course intercepting and tracking within the preceding 6 calendar months. Those tasks may be completed in flight or in an approved flight simulation training device observed by a qualified instructor or check pilot. By contrast, 14 CFR 135.243 mandates that the Pilot in Command in passenger-carrying operations of a turbojet airplane, an airplane with 10 or more passenger seats, or a multiengine commuter operation hold an ATP certificate with appropriate category, class, and type ratings.

For commuter operations as defined in 14 CFR Part 110, 14 CFR 135.244 also requires a newly designated turbojet Pilot in Command to complete 25 hours of operating experience in flight under the supervision of a qualified check pilot. Under 14 CFR 135.244, those hours may be reduced to not less than 50 percent by substituting one additional takeoff and landing for each hour of flight. By our calculation from 14 CFR 135.244, maximum takeoff-and-landing substitution sets a regulatory floor of 12.5 hours of supervised turbojet commuter operating experience.

Training under 14 CFR Part 135 Subpart H is strictly regulated regardless of company size. Under 14 CFR 135.323, 135.324, and 135.341, the operator must maintain an FAA-approved training curriculum conducted in-house or through a certificated Part 142 training center. Crewmembers must complete initial Crew Resource Management, high-altitude decompression, windshear, and ground-icing instruction, followed by recurrent training and proficiency checks within every 12-calendar-month window (14 CFR 135.330 through 135.351).

Checklist for Pilots Weighing a Part 135 Regional Jet Offer

Forum posts go out of date quickly whenever an operator revises its work rules, fleet mix, or training agreements. Before accepting an interview or signing an offer letter with any Part 135 regional jet operator, verify the current operational terms directly in writing using our team's due-diligence checklist.

  • Verify written contract and training-agreement terms: Request all written work rules, duty and rest scheduling policies, and any promissory note or service-commitment duration before starting ground school.
  • Ask for realistic monthly block hours by base and fleet: Compare average monthly flight hours on reserve versus a line holder so you can project how many months it will take to reach 1,500 total hours or unrestricted ATP minimums.
  • Audit your PIC hours before counting on an internal upgrade: Confirm you already meet or have a path to the 500-hour PIC requirement for ERJ or CRJ Captain upgrade, since Part 135 Second in Command time does not build PIC hours.
  • Check commuter logistics against CASS and KCM: Compare flight frequency from your home airport into Charlotte, Phoenix, Chicago, Fort Lauderdale, or White Plains and ask about reserve callout windows and hotel policies during training and base assignments.
  • Prepare concrete aeronautical decision-making stories for your interview: Practice speaking clearly through maintenance deferrals, winter ground-icing holdover decisions, IFR alternates, and multi-crew communication under 14 CFR Part 135.

Practice example

Tell me about a time an aircraft maintenance issue or weather delay disrupted a flight you were scheduled to operate, and how you handled safety and passenger expectations.

Example answer written by our team. The applicant is invented. During a multiengine cross-country charter leg, I noticed a fluctuating alternator load indication during our run-up check while passengers were already strapped in the cabin. Temptation to depart was high because our passengers were trying to make an evening dinner meeting, and the needle briefly stabilized when I cycled the switch. Instead of rationalizing the anomaly, I taxied back to the ramp, shut down, and coordinated directly with maintenance control so a technician could inspect the voltage regulator. Once the engine was secure, I stepped back to explain the exact situation plainly to our passengers, gave them a realistic timeline for the inspection, and helped our operations desk arrange ground transport when the part needed replacement. Walking away from a questionable electrical system on the ground kept a minor write-up from becoming an in-flight load-shedding emergency in instrument conditions.

This answer shows calm conservative judgment on the ground without blaming dispatch or maintenance. It also proves that you communicate clearly with passengers and operations teams during irregular regional operations, which hiring panels test heavily at Part 135 carriers.

Practice this on Fourstripe. Pick your airline and a captain runs the interview out loud: TMAAT, about-you, technical and scenario questions, with real follow-ups. You get a scored report on every answer. 7-day trial, then from $149 a week. Start a practice interview

Frequently asked questions

Why are Contour Airlines flights often hard to rebook the same day if canceled?

Contour operates 30-seat regional jets as DOT public charters across 36 scheduled routes, and several regional and island airports run flights only three or four days per week. When maintenance or weather disrupts a flight on a low-frequency route, the next scheduled Contour departure may not operate until a later day, and automatic interline rebooking or bag transfer applies only on single-ticket itineraries with Alaska, American, JetBlue, or United.

Can you get a cash refund if you cancel a Contour Airlines ticket?

Only Flexible fares canceled prior to scheduled departure qualify for a full refund to your original payment method, unless you cancel a Standard or Flexible ticket within 24 hours of booking at least 7 days before departure. Standard fares canceled at least 1 hour before departure receive a 365-day travel credit, Super Saver fares allow no changes or credits, and missing the 1-hour pre-departure cutoff forfeits the entire fare.

How much does Contour Airlines charge for checked bags?

Effective May 1, 2026, Super Saver and Standard fares charge $45 for a first checked bag, $55 for a second checked bag, and $200 for each additional bag up to 90 linear inches (contourairlines.com, as of November 2026). Flexible fares include a complimentary first checked bag, while 1 carry-on up to 22 x 14 x 9 inches and 1 personal item are included on all fares.

What are the First Officer flight-hour minimums at Contour Airlines?

In its 2026 career listings, Contour Careers posts minimum qualifications of 500 total flight hours and 25 multiengine hours for CRJ and ERJ First Officers, alongside 1,000 total hours for the Embraer Legacy 600 and 1,200 total hours for the Cessna Citation XLS. Under 14 CFR 135.245, Part 135 Second in Command pilots must hold at least a commercial pilot certificate with appropriate category and class ratings and an instrument rating.

Do Contour Airlines pilots get CASS, Known Crew Member, and jumpseat privileges?

Yes. According to Contour's employee benefits page, pilots are enrolled in Known Crew Member (KCM) and CASS with reciprocal jumpseat agreements, and also receive space-available travel privileges on Contour and MyIDTravel partner carriers.

Where are Contour Airlines pilot bases for the ERJ and CRJ fleets?

Contour lists ERJ pilot bases in Charlotte, NC and Phoenix, AZ, and CRJ pilot bases in Chicago, IL, Fort Lauderdale, FL, and White Plains, NY. Specific base availability and fleet assignments are discussed with applicants during the interview process.

Sources