Freight Airlines: FAA Operating Rules, Pilot Rest Limits, and Hiring Records
Short answer: In the United States, freight airlines operate under 14 CFR Part 119 certificates and fly under Part 121 (payloads over 7,500 pounds) or Part 135 (payloads of 7,500 pounds or less in common carriage). Under FAA Advisory Circular AC 120-49B (dated October 7, 2024), an all-cargo operation is legally defined as a nonscheduled operation, and all Part 121 and Part 135 cargo pilots are subject to mandatory background checks through the FAA Pilot Records Database (PRD) under 14 CFR Part 111.
How the FAA classifies freight airlines under 14 CFR Part 119
If you are preparing to interview at a cargo carrier or researching air freight networks, your starting point is Title 14 of the Code of Federal Regulations (14 CFR) Part 119. Under 14 CFR 119.5, no person may operate as a direct air carrier or as a commercial operator without an appropriate certificate and operations specifications (OpSpecs). Direct air carriers must also hold economic authority from the Department of Transportation (DOT).
FAA Advisory Circular AC 120-49B outlines a five-step process to determine which certificate and operating rule apply, distinguishing common carriage (holding out to transport property for compensation) from noncommon carriage. Prospective air carriers must submit their formal certification application to the FAA well ahead of planned operations, at least 90 days before intended operations under 14 CFR 119.35. The FAA air carrier certification framework is organized into five structured phases and three gating milestones, requiring all phase items to be completed before moving past each gate. Applicants submit preapplication materials through the FAA Safety Assurance System External Portal, with regulatory guidance maintained in the FAA Dynamic Regulatory System.
Second, Part 119 divides certificates into two categories based on geography. An Air Carrier Certificate is issued to applicants conducting interstate, foreign, or overseas transportation, or carrying mail. An Operating Certificate is issued to applicants conducting intrastate transportation or noncommon carriage.
Under AC 120-49B paragraph 2.3.4.1, scheduled operations include passenger flights where departure location, departure time, and arrival location are offered in advance, and those flights may also carry cargo or mail in the belly. However, the FAA defines an all-cargo operation as a nonscheduled operation. Even when a freight airline flies the exact same route every night, an all-cargo operation falls under nonscheduled classification in the certification flowchart, which places main-deck Part 121 freighters under supplemental authority unless authorized otherwise under 14 CFR 119.21.
- Common carriage (Part 121 or Part 135): Holding out to the public to transport property from place to place for compensation.
- Noncommon or private carriage (Part 125 or Part 135): Transporting cargo for compensation or hire without holding out to the public.
- Part 125 cutoff (14 CFR 119.23): Applies when common carriage is not involved and the airplane or powered-lift has a seat configuration of 20 or more passengers or a maximum payload capacity of 6,000 pounds or more.
- Noncommon Part 135 cutoff (14 CFR 119.23): Applies to noncommon or private carriage for compensation or hire in an airplane or powered-lift with fewer than 20 seats and a maximum payload capacity of less than 6,000 pounds.
Part 121 vs. Part 135 cargo operations and payload limits
In the US air cargo network, Part 135 operators and Part 121 carriers work side by side. As the FAA Office of Hazardous Materials Safety notes, Part 135 operators range from single-aircraft companies to large fleets that provide a feeder network moving cargo into larger Part 121 air carriers, while also delivering cargo to remote communities.
The dividing line between Part 121 and Part 135 cargo flying centers on payload capacity, seat configuration, and whether the flight is scheduled or nonscheduled. Under AC 120-49B Chapter 3 and Chapter 6, the 7,500-pound payload mark is the primary boundary for common carriage cargo airplanes.
Under 14 CFR 119.8, certificate holders authorized to conduct operations under either Part 121 or Part 135 must also maintain a Safety Management System (SMS) that meets the requirements of 14 CFR Part 5.
FAA operating authorities and payload boundaries (14 CFR Part 119 and AC 120-49B)
| Operating Authority | Carriage Type | Aircraft and Payload Threshold | Typical Freight Role |
|---|---|---|---|
| Part 121 Supplemental | Common carriage (nonscheduled / all-cargo) | Payload capacity of more than 7,500 pounds (or more than 30 passenger seats) | Main-deck domestic and international all-cargo freighters and negotiated cargo charters |
| Part 121 Domestic / Flag | Common carriage (scheduled) | Turbojet, more than 9 passenger seats, or payload capacity of more than 7,500 pounds | Scheduled passenger airlines carrying belly cargo or mail, plus authorized scheduled cargo routes |
| Part 135 On-Demand | Common carriage (nonscheduled / all-cargo) | 30 passenger seats or fewer and a maximum payload capacity of 7,500 pounds, or any rotorcraft | Regional feeder cargo aircraft, ad-hoc freight charters, and beyond visual line of sight (BVLOS) cargo drones |
| Part 135 Noncommon | Noncommon or private carriage for hire | Fewer than 20 passenger seats and a payload capacity of less than 6,000 pounds | Dedicated contract cargo flying for a specific client without holding out to the public |
| Part 125 | When common carriage is not involved | 20 or more passenger seats or a maximum payload capacity of 6,000 pounds or more | Large private corporate or noncommon carriage freight transport |
Flight time and rest rules for all-cargo pilots (Part 121 Subparts Q, R, and S)
Before a cargo technical interview, know how cargo duty and rest rules differ from passenger airline rules. Under 14 CFR 121.470, 121.480, and 121.500, all-cargo operations are governed by Part 121 Subparts Q (Domestic), R (Flag), and S (Supplemental). However, a certificate holder may voluntarily elect to apply the passenger flight time and duty rules of 14 CFR Part 117 to its government-contract cargo flights, its non-government all-cargo flights, or both. Once a carrier elects to put a category of cargo operations under Part 117, it may not segregate those operations between the legacy subpart and Part 117. Carriers may exceed a provision of Subpart Q, R, or S only if approved by the FAA under a Fatigue Risk Management System (FRMS).
Under 14 CFR 121.471 (Subpart Q, Domestic all-cargo), a flight crewmember's total flight time in all commercial flying may not exceed 1,000 hours in any calendar year, 100 hours in any calendar month, 30 hours in any 7 consecutive days, and 8 hours between required rest periods. Every 7 consecutive days, the carrier must relieve the crewmember from all further duty for at least 24 consecutive hours. During the 24 consecutive hours preceding the scheduled completion of any flight segment, the crewmember must receive a scheduled rest period scaling with scheduled flight time: 9 consecutive hours of rest for less than 8 hours of flight, 10 hours of rest for 8 to less than 9 hours of flight, and 11 hours of rest for 9 or more hours of flight. Under 14 CFR 121.471(c), the carrier may reduce these rests to 8, 8, and 9 hours respectively, provided a compensatory rest of at least 10, 11, or 12 hours begins no later than 24 hours after the start of the reduced rest period.
Under 14 CFR 121.481 through 121.485 (Subpart R, Flag all-cargo), limits vary by crew size. For a one- or two-pilot crew, a pilot may fly 8 hours or less in 24 consecutive hours without a rest period. If scheduled for more than 8 hours, the pilot must receive an intervening rest period at or before the end of 8 scheduled hours equal to at least twice the hours flown since the preceding rest period (minimum 8 hours), plus at least 18 hours of rest after flying more than 8 hours in 24 consecutive hours. One- or two-pilot flag crews are capped at 32 flight hours in 7 consecutive days, 100 hours in a calendar month, and 1,000 hours in 12 calendar months. Adding a third flight crewmember (two pilots plus one additional flight crewmember under 14 CFR 121.483) raises the daily cap to 12 hours in 24 consecutive hours, with limits of 120 hours in 30 consecutive days and 300 hours in 90 consecutive days. Crews of three or more pilots and an additional flight crewmember (14 CFR 121.485) require onboard sleeping quarters whenever scheduled to fly more than 12 hours in 24 consecutive hours, and are capped at 350 hours in 90 consecutive days.
Under 14 CFR 121.503 through 121.523 (Subpart S, Supplemental all-cargo), domestic rules cap pilots at 8 hours of flight deck duty in 24 consecutive hours, 100 hours in 30 consecutive days, and 1,000 hours in a calendar year, with at least 16 hours of rest after flying more than 8 hours in 24 consecutive hours. A nonstop transcontinental exception under 14 CFR 121.503(f) allows up to 10 hours aloft for a crew of two pilots and a flight engineer in a pressurized airplane with independent approved communications and dispatch. Duty time in a 24-hour period is capped at 16 hours for two-pilot crews, 18 hours for three-pilot crews (maximum 12 hours aloft), and 20 hours for four-pilot crews (maximum 16 hours aloft). For international supplemental flights under 14 CFR 121.523, a heavy crew of three or more pilots and additional airmen may be scheduled for up to 30 hours of continuous duty before requiring a 10-hour ground rest period, and must receive at least 16 hours of ground rest after completing a duty period where continuous duty exceeded 24 hours. Deadhead time exceeding 4 hours before flight duty counts half as duty time unless preceded by 10 hours of ground rest.
Part 121 all-cargo flight time and rest limits comparison (14 CFR Part 121 Subparts Q, R, and S)
| Rule / Crew Complement | 24-Hour Flight / Aloft Limit | Weekly / Monthly / Quarterly Cap | Annual Cap | Key Rest Requirement |
|---|---|---|---|---|
| Subpart Q: Domestic All-Cargo (14 CFR 121.471) | 8 hours between required rest periods | 30 hours in 7 days. 100 hours in a calendar month | 1,000 hours in a calendar year | 9, 10, or 11 hours rest (reducible to 8, 8, or 9 hours with 10, 11, or 12 hours compensatory rest). 24 hours off per 7 days |
| Subpart R: Flag 1 or 2 Pilots (14 CFR 121.481) | 8 hours without rest | 32 hours in 7 days. 100 hours in a calendar month | 1,000 hours in 12 calendar months | 18 hours rest after flying more than 8 hours in 24 hours. 24 hours off per 7 days |
| Subpart R: Flag 2 Pilots + 1 Additional Crewmember (14 CFR 121.483) | 12 hours | 120 hours in 30 days. 300 hours in 90 days | 1,000 hours in 12 calendar months | 18 hours rest after flying 20+ hours in 48 hours or 24+ hours in 72 hours. 24 hours off per 7 days |
| Subpart R: Flag 3+ Pilots + 1 Additional Crewmember (14 CFR 121.485) | Sleeping quarters required if over 12 hours | 350 hours in 90 days | 1,000 hours in 12 calendar months | Upon return to base, rest equal to at least 2 times hours flown since last base rest |
| Subpart S: Supplemental 2 Pilots (14 CFR 121.503, 121.505) | 8 hours flight deck. 16 hours max duty | 100 hours in 30 days | 1,000 hours in a calendar year | 16 hours rest after flying more than 8 hours in 24 hours. 24 hours off per 7 days |
| Subpart S: Supplemental 3 or 4 Pilots (14 CFR 121.507, 121.509) | 8 hours flight deck. 12 hours aloft (18 hours duty) for 3 pilots. 16 hours aloft (20 hours duty) for 4 pilots | 100 hours in 30 days | 1,000 hours in a calendar year | 16 hours rest after flying more than 8 hours in 24 hours. 24 hours off per 7 days |
| Subpart S: International 3+ Pilots + Additional Airmen (14 CFR 121.523) | 12 hours flight deck duty (FE/navigator). 30 hours max continuous duty | 350 hours in 90 days | 1,000 hours in 12 calendar months | 16 hours ground rest if continuous duty exceeds 24 hours. Base return rest equal to 2 times hours aloft |
Pilot hiring and the Pilot Records Database (14 CFR Part 111)
If you are applying to fly for a Part 121 or Part 135 freight airline, your background check is governed by 14 CFR Part 111 (Pilot Records Database). Under 14 CFR 111.5, the Pilot Records Improvement Act (PRIA) ceased to be effective on September 9, 2024, and is no longer an available alternative to the PRD.
Under 14 CFR 111.105, no reviewing entity (including any Part 119 certificate holder operating under Part 121, 125, or 135) may permit an individual to begin service as a pilot until it has evaluated all relevant information in the PRD. Before the freight carrier can access your file, you must apply for electronic PRD access at least 7 days in advance under 14 CFR 111.305, affirm that your 5-year employment history in the database is complete under 14 CFR 111.310, and grant written consent.
In addition to FAA records and previous employer records, the hiring freight carrier must obtain your written consent to run a National Driver Register (NDR) search under 14 CFR 111.110 for state motor vehicle driving records. If you request a copy of the state driving records obtained, the carrier must provide them within 30 days under 14 CFR 111.120, and the carrier must log verification of the NDR check in the PRD within 45 days of your PRD date of hire under 14 CFR 111.240.
- FAA records evaluated (14 CFR 111.135): Current pilot and medical certificates, type ratings, limitations, failed practical tests under Part 61, unoverturned enforcement findings, accident or incident records as PIC or SIC, and DOT drug/alcohol violations (positive tests, alcohol results of 0.04 or greater, or refusals).
- Employer reporting timeline (14 CFR 111.215): Reporting entities must upload new training, qualification, proficiency, drug/alcohol, final disciplinary, and final separation records within 30 days (or within 14 days upon request for certain eligible on-demand or Part 91 operators unless involving removal from flight status or termination).
- Excluded records (14 CFR 111.225 and 111.245): Employers are prohibited from reporting flight time, duty time, rest time, physical exam/medical records, recent flight experience, or protected Voluntary Safety Reporting Program (Part 193) reports to the PRD.
- Dispute resolution (14 CFR 111.250): If you flag an error in your PRD record, the reporting operator must correct it within 10 days or initiate a dispute investigation within 30 days.
Checklist: Preparing your records and regulatory knowledge for a freight airline interview
Use this step-by-step checklist written by our team to audit your FAA records and technical knowledge before interviewing with a Part 121 or Part 135 cargo carrier.
- Register for electronic PRD access at least 7 days before your interview or consent deadline (14 CFR 111.305) using your exact pilot certificate name and number.
- Audit your 5-year employment history in the PRD and update any missing flying or non-flying employers before signing your release consent (14 CFR 111.310).
- Pull and review your own PRD record to verify that all check pilot comments, simulator proficiency events, and training outcomes under Part 91, 121, 125, or 135 are accurate (14 CFR 111.225).
- Submit a formal correction request through the PRD if you discover an inaccuracy, which triggers the operator's 10-day correction or 30-day investigation window (14 CFR 111.250).
- Sign your separate written consent for the National Driver Register (NDR) motor vehicle check and request copies of any returned state driving records, which the carrier must supply within 30 days (14 CFR 111.110 and 111.120).
- Review whether your target freight carrier operates its schedules under Part 121 Subpart Q (Domestic), Subpart R (Flag), Subpart S (Supplemental), or an elected Part 117 / FRMS program.
- Practice explaining how you manage circadian flips, backside-of-the-clock fatigue, and hazardous materials (NOTOC / dangerous goods) verification on the ramp.
Part 135 cargo certificate classifications: Single-pilot to Standard
Not all Part 135 cargo feeders operate large fleets. Under AC 120-49B Section 6.3, the FAA classifies Part 135 certificates into four tiers based on the number of pilots and aircraft authorized in the carrier's OpSpecs.
Even a single-pilot Part 135 cargo operator must designate management officials responsible for operational control under 14 CFR 135.77 and maintain an approved hazardous materials training program. If an operator flies internationally (including overflight of international waters), ICAO Standards and Recommended Practices require full management, manuals, and training programs.
Part 135 certificate classifications (FAA AC 120-49B Section 6.3)
| Part 135 Classification | Pilot Limits | Aircraft and Seat Limits | Geographic and Approach Limits |
|---|---|---|---|
| Single-Pilot Part 135 | 1 specific pilot named on OpSpecs | On-demand or commuter size limits (up to 7,500 lb payload) | Manuals and management positions generally not required domestically, but hazmat training is mandatory |
| Single PIC Part 135 | 1 PIC and up to 3 SICs named on OpSpecs | Type certificated with 9 passenger seats or fewer | Limited to US, Canada, Mexico, and the Caribbean. No CAT II or CAT III approaches |
| Basic Part 135 | Maximum of 5 pilots (including SICs) | Maximum of 5 aircraft across at most 3 aircraft types. 9 passenger seats or fewer | Limited to US, Canada, Mexico, and the Caribbean. No CAT II or CAT III approaches |
| Standard Part 135 | No pre-set limit on pilot headcount | No pre-set limit on fleet size (subject to Part 135 payload/seat rules) | Authorized per OpSpecs as qualified under 14 CFR 119.51(c) |
Practice example
Tell me about a time you discovered a discrepancy with cargo loading, weight and balance, or hazardous materials paperwork prior to pushback, and how you handled the pressure to depart on time.
Example answer, written by us. It is not a real applicant's story. While flying a night feeder route under Part 135, I arrived at the aircraft 45 minutes before departure and reviewed the load manifest and dangerous goods paperwork. I noticed a pallet contained a package marked as a regulated hazardous material, but the required dangerous goods acceptance documentation was incomplete and did not match our company hazardous materials manual. The ramp supervisor was eager to close the cargo door so we would make our sort-hub slot for the connecting Part 121 freighter. I calmly explained that under our operations specifications and FAA hazardous materials regulations, we could not accept or transport the shipment until it was properly verified or removed. I called dispatch immediately, coordinated with the ramp lead to pull the single discrepant package off the pallet, and recalculated our weight and balance. We departed 12 minutes behind schedule, made up six minutes en route, and protected the safety and regulatory compliance of the flight.
This answer shows calm leadership under time pressure without blaming ground staff. It connects a real ramp scenario directly to FAA operations specifications, hazardous materials compliance, and coordination with dispatch.
Practice this on Fourstripe. Pick your airline and a captain runs the interview out loud: TMAAT, about-you, technical and scenario questions, with real follow-ups. You get a scored report on every answer. 7-day trial, then from $149 a week. Start a practice interview
Frequently asked questions
What certificate does an all-cargo airline need to operate in the United States?
Under 14 CFR 119.5 and FAA Advisory Circular AC 120-49B, an operator conducting interstate, foreign, or overseas cargo common carriage is issued an Air Carrier Certificate, while an operator conducting intrastate common carriage or noncommon carriage is issued an Operating Certificate. Depending on whether the airplane's maximum payload capacity exceeds 7,500 pounds, the carrier operates under 14 CFR Part 121 or Part 135.
Are all-cargo flights considered scheduled or nonscheduled under FAA rules?
Under FAA Advisory Circular AC 120-49B (paragraphs 2.3.4.1 and 2.3.4.2), an all-cargo operation is defined as a nonscheduled operation. While scheduled passenger operations may carry cargo or mail in addition to passengers, dedicated all-cargo operations fall under nonscheduled rules, such as Part 121 supplemental authority or Part 135 on-demand authority.
Do Part 121 cargo pilots fly under Part 117 rest rules?
By default, Part 121 all-cargo operations are governed by the flight time and rest rules in 14 CFR Part 121 Subparts Q (Domestic), R (Flag), and S (Supplemental), which generally cap annual commercial flying at 1,000 hours. However, under 14 CFR 121.470, 121.480, and 121.500, an all-cargo certificate holder may voluntarily elect to operate its flights under 14 CFR Part 117.
Must a freight airline have a hazardous materials program if it refuses dangerous goods?
Yes, under 14 CFR 119.49 and AC 120-49B, every certificate holder's operations specifications must state whether it is authorized or prohibited from carrying hazardous materials, and the operator must maintain an FAA-approved hazardous materials manual and employee training program for either a will-carry or will-not-carry policy.
How do freight airlines check a pilot's background before hiring?
Under 14 CFR Part 111, which fully replaced PRIA on September 9, 2024, a Part 121 or Part 135 operator must obtain the pilot's written consent through the FAA Pilot Records Database (PRD) and evaluate FAA certificate and enforcement records, DOT drug and alcohol records, previous employer training and disciplinary records, a 5-year employment history, and National Driver Register (NDR) motor vehicle records before the pilot begins service.
Sources
- 14 CFR Part 119: Certification: Air Carriers and Commercial Operators (eCFR)
- 14 CFR Part 121 Subpart Q: Flight Time Limitations and Rest Requirements: Domestic Operations (eCFR)
- 14 CFR Part 121 Subpart R: Flight Time Limitations: Flag Operations (eCFR)
- 14 CFR Part 121 Subpart S: Flight Time Limitations: Supplemental Operations (eCFR)
- 14 CFR Part 111: Pilot Records Database (eCFR)
- FAA Safety Assurance System (SAS) External Portal
- FAA Dynamic Regulatory System (DRS)
- FAA Advisory Circular AC 120-49B: Parts 121 and 135 Certification
- FAA Hazardous Materials: Regularly Scheduled Air Carriers (Part 121)
- FAA Hazardous Materials: Charter-Type Services (Part 135)
- FAA Hazardous Materials: Unmanned Aircraft System (UAS) or Drone Operations